日韩亚洲欧美色图,久久亚洲精精品中文字幕,国产,日韩,欧美综合在线,丰满少妇2中文免费观看,国产精品一区二区20P发布,我强进了老师身体在线观看

手機(jī)版
1 2 3 4
首頁 > 新聞中心 > 翻譯公司資訊 >
翻譯公司資訊

世聯(lián)翻譯公司完成工商制造英文翻譯

發(fā)布時間:2018-08-30 14:01  點(diǎn)擊:

世聯(lián)翻譯公司完成工商制造英文翻譯
COMPANY
ADDRESS 1
ADDRESS 2
COUNTRY
For the attention of TITLE NAME SURNAME, POSITION
 
Dear Sir,
Budget Quotation for the Supply of a Cathode Block Preheating System
Our Ref: EA…..
 
Further to our recent communications, we are now pleased to submit our budget proposal for the supply of a new lift-off cover type Cathode Block Preheating System.
 
The system would be designed to heat up collector bars in a period of 100 minutes, whilst achieving a close temperature uniformity over the entire length of the steel bar at the end of the heat-up cycle, prior to casting. 
 
The operation of our system is based on the use of mesh type radiant plaque burners, which represent the state-of-the-art in surface combustion technology and are proven to release heat uniformly over a given surface, making them ideal for this type of application. These burners would be incorporated in a ceramic fibre lined fixed cover hood. This would maintain a relatively low cold face temperature of the cover hood backplate, and contain the heat under the cover to protect the combustion equipment mounted above. The cover hood would have a total of four individual cathode block preheating positions.
 
A set of four long, narrow, rectangular burners, laid out end-to-end to match the top surface of each bar, would transfer heat in infrared mode over the length of the bar. Due to the shape of the burners and the nature of the combustion, flame impingement onto the neighbouring carbon block would be avoided, thus keeping oxidation of the carbon to a minimum.
 
 
Hotwork Combustion Technology Ltd
Bretton Street, Savile Town, Dewsbury, West Yorkshire WF12 9DB, UK
Tel: +44 (0) 1924 506506, Fax: +44 (0) 1924 506311
E-mail: info@hotworkct.com, Web: www.hotworkct.com
Co. Reg. No. 4386957, VAT Reg. No. GB 789581849

The system would be designed for reliability in operation, low maintenance, durability, ease of operation, energy efficiency and would incorporate all necessary items to comply with EN746-2 such as pressure proving, purge proving, automatic burner start-up and continuous flame supervision. After start-up, the burners will be set on a fixed rate and a timer with audible alarm and beacon will indicate the end of the heat-up cycle, at each preheating position.

A single atmosphere thermocouple, mounted in the flue at each preheating position, would be set to monitor 'over-temperature' of the particular preheat position. Should an over-temperature condition occur, the system would automatically 'shut down' that particular preheating position. 
 
As part of our scope of supply, we would also provide three bases to ensure that the cathode block assemblies are accurately located and horizontal during the preheating and casting operations. As explained, this arrangement would enable you to use one base for loading a set of four bar/block assemblies, one base for preheating another set and one base for casting and leaving another set to ‘rest’. This would allow you to cast twelve blocks during an 8-9 hour shift.
 
Hotwork CT have a wealth of experience in the design of combustion systems for the aluminium industry (reduction cell preheating systems, crucible preheating systems, melting furnace combustion systems) and we do hope that we will have the opportunity to work with you on this project.
 
We trust our proposal meets with your requirements. Please do not hesitate to contact us should you have any queries and we look forward to hearing from you in the near future.
 
Yours faithfully,
 
Denis Hunzinger
Sales and Marketing Manager
 
Photographs showing a Lift-off Cover Cathode Block Preheating System
to preheat 4-off cathode block assemblies illustrating the principal of operation.
 
TECHNICAL
 
1. General
 
Type of System:               Cathode Block Preheating System
 
Preheater Cover Hood                      
Dimensions:                                        Approx. 4500 mm long x 2700 mm wide x 3000 mm high. The hood will be of modular construction to facilitate site assembly, and mounted on four supporting legs.
     
Duty:                                                   To preheat steel collector bars from ambient to 550 oC in 100 minutes (max.), prior to casting the bars into the cathode blocks. NB: heat up times will vary depending on the ambient temperature at the time of preheating.
 
Temperature Uniformity:                    +/- 10 oC on the top surface of each bar (contained within the carbon block recess) at the end of the cycle.
Collector Bar and                             
Cathode Block Dimensions:              As per your Drawings No. ………………..
                                                                                                            
Bar and Block Configuration:             Four cathode block preheating positions. Collector bar in each cathode block recess to be positioned by overhead shop crane.
Cathode Block preheated side by side at 500mm centres. Height to top of Cathode Block to be agreed.
 
Production requirements:                  12-off cathode block assemblies per day
 
Proposed Burners:                              16-off mesh type radiant plaque burners, four per collector bar, each approx. 1000 mm long x 180 mm wide.
 
Rating per Collector Bar:                    150 kW (approx.)
 
Total Rating:                                        600 kW
 
Fuel type:                                            Natural gas available at 250 mb
 
Combustion Air Fan (also
includes air to drive flue
eductor & air curtain systems):          1,200 m3/h approx. at 65 mbar. Noise level: 85 dbA (max.) at 1 metre, with inlet filter
 
System exhaust:                                 Discharge directly into workshop.
 
Electrical Supply:                                380V +/- 20%, 3 Ph, 50 Hz (control: 110V.)
                                                                                   
All services to be available within 6 m of the preheater.

2. Scope of Supply
 
Our proposal includes for the supply of a Lift-off Cathode Block Preheating System as follows:
 
                a. A combustion system based on the use of 16-off mesh type radiant plaque burners to operate on natural gas.
 
                b. A control panel for the safe operation of the combustion system including flame programmers and heat-up cycle timers.
 
                c. A fabricated, fibre lined cover hood onto which part of the combustion equipment would be mounted.
 
                d. Design of the combustion system, the control panel and the hood including combustion schematic, electrical diagrams, general arrangement drawings, operating and maintenance manuals.
 
                e. Supply of three preheating bases
 
                f. Pre-testing and pre-commissioning of the system in our works
 
                g. Supply DDU PLANT LOCATION Incoterms 2000
 
                h. Supervision of site installation and site commissioning
 
                i. Supply of two sets of Operating and Maintenance Instructions on CD-ROM in English.
 
 
3. System Description
 
The system would consist of a fabricated lift-off cover hood of modular construction mounted on four legs. It would incorporate four sets of four mesh type radiant plaque burners. A set of burners will be located directly over each collector bar and radiate heat uniformly over the heating zone, effectively forming a long and narrow combustion channel with sides made of stack bonded ceramic fibre modules. The fibre would cover the top of the carbon blocks (with a small clearance gap), to protect the carbon from oxidation.
 
The burners have been sized to enable the collector bars to reach a temperature of 550 oC +/- 10 oC., in approx. 100 minutes of heating. They would operate in infrared mode for optimum heat transfer. Products of combustion would exit the hood through small flues (eductor air driven) at both ends of each ‘combustion channel’.
 
The combustion air fan would be mounted on top of the hood to feed air to the Preheating hood. The gas safety station would be located in an agreed position, to feed gas to the hood. The floor mounted control panel would contain the flame programmers, timers, with sirens and beacons to indicate the end of each heat-up cycle.
 

4. Combustion System
 
In order to achieve a uniform heat release over the entire length of the collector bars, as recommended by carbon block suppliers, we have chosen to use mesh type radiant plaque burners which would be fed with premix gas and operate in infrared mode for optimum heat transfer to the bars.
 
In order to heat up the length of each bar, four burners laid out end-to-end would be used. Each burner will be approx 1000 mm long x 180 mm wide and each group of four burners will have a total rating of approx. 150 kW. The cathode block preheater would have 16 burners with a total rating of 600 kW. The system would be fitted with automatic burner ignition and flame supervision by ionisation rod. The construction of the burners makes them very sturdy and resistant to both thermal and mechanical shock. As the mesh used for the burner has a low thermal mass, the burner starts radiating almost immediately after ignition.
 
The combustion system would be designed to comply with EN746-2 and will also include the following equipment:
Ÿ  A hood-mounted fan to supply approx. 1200 m3/h of combustion air at 65 mbar, an inlet silencer for 85 dBA (max.) at 1 metre and an inlet filter.
Ÿ  A three way air pressure switch test valve to check the presence of air.
Ÿ  An orifice plate with a pressure switch across it for purge proving.
Ÿ  A motorised air control valve with low fire pressure switch across it to start the combustion system at low fire.
Ÿ  Air limiting orifice valves
Ÿ  A main gas isolation valve
Ÿ  A gas filter
Ÿ  A gas pressure governor
Ÿ  A gas meter for totalised gas flow
Ÿ  High gas pressure and low gas pressure switches
Ÿ  A main gas safety shut-off solenoid valve
Ÿ  A 6m long steel braided gas flexible with a flex proving device to check the integrity of the flexible prior to ignition.
Ÿ  For each group of two burners (i.e. two groups per bar), a gas isolation valve, a safety shut-off valve, a ratio regulator and a mixer.
Ÿ  For each burner, a pre-mix limiting orifice valve to adjust burner rating.
 
 
5. Control System
 
The control system will consist of a free standing enclosure containing the combustion air fan contactor and motor protection unit, flame programmers, a panel transformer 380V to 110V and timers with associated beacons and alarm to indicate the end each preheat cycle.
Flexible cables would connect the preheating hood to the control panel.
 
6. Hood construction
 
The hood would be made of mild steel plate, strengthened and profiled to suit the particular burner heat flow pattern i.e. four long and narrow ‘combustion channels’ separated by fibre modules. Insulated flues at the end of each channel would allow the exhaust gases to flow out of the hood (these would be eductor air driven).
 
The combustion air equipment and fan would be mounted on top of the hood as would the burner gas components. The gas regulation/metering equipment from the main isolation valve to the gas flexible will be installed on the floor, between supply and hood.
 
The hood will be mounted on four supporting legs and, in order to help the crane operator to position the hood, two guiding tubes will be fitted in two opposing corners to be used in conjunction with two guiding posts on each base.
 
In terms of thermal insulation, we propose to use stack bonded anchored modules made of ceramic fibre material to protect the hood from the heat, form combustion channels as described in section 3, and protect the cathode blocks from oxidation.
 
 
6. Installation and commissioning
 
Our system would be designed in modular form for ease of assembly on site. It would be manufactured, pre-assembled, pre-tested and pre-commissioned in our works in order to minimise site time. We have estimated that mechanical and electrical site installation would be completed in 7 consecutive 12h days and commissioning would be completed in 4 consecutive 12h days including 1 day for trials. We propose that the system be installed by COMPANY fitters under the supervision of an HCT foreman. Please confirm that this arrangement is acceptable. Commissioning would be carried out by two HCT engineers.
 
Our budget price includes site time, travel time, travel costs, accommodation and expenses. Any extra time required for reasons beyond HCT’s control would be charged at £….../day for the site installation supervisor and £…...//day per commissioning engineer.
 
7. Exclusions
 
Ÿ  Building or foundation work.
Ÿ  Customs clearance, import duties and VAT
Ÿ  Offloading of equipment at site
Ÿ  Storage of equipment
Ÿ  Any extended heating trials
Ÿ  Automatic temperature control
Ÿ  Temperature recorder
Ÿ  Preheater hood lifting equipment
Ÿ  Any services more than 6 m away
Ÿ  Site cranage
Ÿ  Scaffolding on site
Ÿ  Any mechanical/electrical installation other than supervision
Ÿ  Electrical site wiring
Ÿ  Interpreter during site installation and commissioning
Ÿ  Any document or formalities that may be required to import the goods into COUNTRY or use the goods in COUNTRY (although we would provide reasonable assistance to COMPANY to obtain the necessary permits, if required).
Ÿ  Any major items or services not specified.

COMMERCIAL
 
 
1. Price
 
Our budget price for the design, manufacture, shop testing, supply, supervision of installation and commissioning of a Lift-off Cathode Block Preheating System, generally as described herein, is:
 
£………….. DDU PLANT LOCATION Incoterms 2000
(………………………… Pounds Sterling)
 
2. Delivery
 
·         4-6 weeks from receipt of downpayment to submission of drawings for COMPANY’s approval (schematic diagram and arrangement drawings).
·         12-14 weeks from acceptance of drawings by COMPANY to the supply of the system on DDU PLANT LOCATION basis
 
3. Terms of Payment
 
To be agreed but we suggest:
  • Thirty percent (30%) downpayment with order against a bank guarantee.
  • Seventy percent (70%) against a Confirmed Irrevocable Letter of Credit drawn at sight on a first class European bank.
 
4. Taxes and duties
 
The above prices are exclusive of all taxes and duties.
 
5. Validity
 
This is a budget proposal and as such is not open for acceptance.
 
6. Confidentiality
 
The contents of this quotation are Strictly Confidential and should not be discussed with or communicated to a Third party.
 
7. Customer care / Quality assurance
 
In order to improve continuously the service that we offer our customers,        Hotwork CT operate a customer care policy. Through a centralised point within the company, your concerns and queries regarding the service you receive will be dealt with objectively and independently. Please contact the office of David Robinson, Managing Director, if a situation arises that you feel requires this sort of attention.

8. Acceptance
 
On turnkey multi-disciplined projects, we recognise the need for a defined end point to contract. With this in mind, Hotwork operate an Acceptance process where measurable parameters are set out, by mutual agreement, to be confirmed during the closing stages of the project.

Typical examples of these parameters are temperature uniformity, fuel usage, production levels and delivery programme benchmarks. The Acceptance/Hand-over procedure will benefit Hotwork and its customers in the elimination of 'grey areas' and uncertainty. This will usually take the form of nominated representatives from both parties "signing off" completed work and agreeing any changes or modifications to the original scope.
 
The specific detail of the Acceptance criteria would be covered during the quotation or post order discussion stages.
 
9. Warranty
 
Our proposal includes for a 12-month defects liability period from date of commissioning or 15 months from delivery whichever is the shortest period. However, our liability will be limited to defects due only to fair wear and tear of items of our supply and to HCT workmanship and design. The equipment should also be correctly maintained during the warranty period. Our liability shall not extend to the failure of the following items which, by their nature, should be considered as consumables:
Ÿ  Ignitors
Ÿ  Ionisation probes
Ÿ  Instrument fuses
Ÿ  Solenoids
Ÿ  Regulator springs and diaphragms.
 
10. Conditions of Sale
 
HCT Standard Conditions of Sale apply.
 
For HOTWORK COMBUSTION TECHNOLOGY LIMITED
 
D. P. Robinson
Managing Director

Unitrans世聯(lián)翻譯公司在您身邊,離您近的翻譯公司,心貼心的專業(yè)服務(wù),專業(yè)的全球語言翻譯與信息解決方案供應(yīng)商,專業(yè)翻譯機(jī)構(gòu)品牌。無論在本地,國內(nèi)還是海外,我們的專業(yè)、星級體貼服務(wù),為您的事業(yè)加速!世聯(lián)翻譯公司在北京、上海、深圳等國際交往城市設(shè)有翻譯基地,業(yè)務(wù)覆蓋全國城市。每天有近百萬字節(jié)的信息和貿(mào)易通過世聯(lián)走向全球!積累了大量政商用戶數(shù)據(jù),翻譯人才庫數(shù)據(jù),多語種語料庫大數(shù)據(jù)。世聯(lián)品牌和服務(wù)品質(zhì)已得到政務(wù)防務(wù)和國際組織、跨國公司和大中型企業(yè)等近萬用戶的認(rèn)可。 專業(yè)翻譯公司,北京翻譯公司,上海翻譯公司,英文翻譯,日文翻譯,韓語翻譯,翻譯公司排行榜,翻譯公司收費(fèi)價格表,翻譯公司收費(fèi)標(biāo)準(zhǔn),翻譯公司北京,翻譯公司上海。
  • “貴司提交的稿件專業(yè)詞匯用詞準(zhǔn)確,語言表達(dá)流暢,排版規(guī)范, 且服務(wù)態(tài)度好。在貴司的幫助下,我司的編制周期得以縮短,稿件語言的表達(dá)質(zhì)量得到很大提升”

    華東建筑設(shè)計研究總院

  • “我單位是一家總部位于丹麥的高科技企業(yè),和世聯(lián)翻譯第一次接觸,心中仍有著一定的猶豫,貴司專業(yè)的譯員與高水準(zhǔn)的服務(wù),得到了國外合作伙伴的認(rèn)可!”

    世萬保制動器(上海)有限公司

  • “我公司是一家荷蘭駐華分公司,主要致力于行為學(xué)研究軟件、儀器和集成系統(tǒng)的開發(fā)和銷售工作,所需翻譯的英文說明書專業(yè)性強(qiáng),翻譯難度較大,貴司總能提供優(yōu)質(zhì)的服務(wù)。”

    諾達(dá)思(北京)信息技術(shù)有限責(zé)任公司

  • “為我司在東南亞地區(qū)的業(yè)務(wù)開拓提供小語種翻譯服務(wù)中,翻譯稿件格式美觀整潔,能最大程度的還原原文的樣式,同時翻譯質(zhì)量和速度也得到我司的肯定和好評!”

    上海大眾

  • “在此之前,我們公司和其他翻譯公司有過合作,但是翻譯質(zhì)量實(shí)在不敢恭維,所以當(dāng)我認(rèn)識劉穎潔以后,對她的專業(yè)性和貴公司翻譯的質(zhì)量非常滿意,隨即簽署了長期合作合同!

    銀泰資源股份有限公司

  • “我行自2017年與世聯(lián)翻譯合作,合作過程中十分愉快。特別感謝Jasmine Liu, 態(tài)度熱情親切,有耐心,對我行提出的要求落實(shí)到位,體現(xiàn)了非常高的專業(yè)性!

    南洋商業(yè)銀行

  • “與我公司對接的世聯(lián)翻譯客服經(jīng)理,可以及時對我們的要求進(jìn)行反饋,也會盡量滿足我們臨時緊急的文件翻譯要求。熱情周到的服務(wù)給我們留下深刻印象!”

    黑龍江飛鶴乳業(yè)有限公司

  • “翻譯金融行業(yè)文件各式各樣版式復(fù)雜,試譯多家翻譯公司,后經(jīng)過比價、比服務(wù)、比質(zhì)量等流程下來,最終敲定了世聯(lián)翻譯。非常感謝你們提供的優(yōu)質(zhì)服務(wù)!

    國金證券股份有限公司

  • “我司所需翻譯的資料專業(yè)性強(qiáng),涉及面廣,翻譯難度大,貴司總能提供優(yōu)質(zhì)的服務(wù)。在一次業(yè)主單位對完工資料質(zhì)量的抽查中,我司因?yàn)槎砦姆g質(zhì)量過關(guān)而受到了好評。”

    中辰匯通科技有限責(zé)任公司

  • “我司在2014年與貴公司建立合作關(guān)系,貴公司的翻譯服務(wù)質(zhì)量高、速度快、態(tài)度好,贏得了我司各部門的一致好評。貴司經(jīng)理工作認(rèn)真踏實(shí),特此致以誠摯的感謝!”

    新華聯(lián)國際置地(馬來西亞)有限公司

  • “我們需要的翻譯人員,不論是筆譯還是口譯,都需要具有很強(qiáng)的專業(yè)性,貴公司的德文翻譯稿件和現(xiàn)場的同聲傳譯都得到了我公司和合作伙伴的充分肯定!

    西馬遠(yuǎn)東醫(yī)療投資管理有限公司

  • “在這5年中,世聯(lián)翻譯公司人員對工作的認(rèn)真、負(fù)責(zé)、熱情、周到深深的打動了我。不僅譯件質(zhì)量好,交稿時間及時,還能在我司資金周轉(zhuǎn)緊張時給予體諒。”

    華潤萬東醫(yī)療裝備股份有限公司

  • “我公司與世聯(lián)翻譯一直保持著長期合作關(guān)系,這家公司報價合理,質(zhì)量可靠,效率又高。他們翻譯的譯文發(fā)到國外公司,對方也很認(rèn)可。”

    北京世博達(dá)科技發(fā)展有限公司

  • “貴公司翻譯的譯文質(zhì)量很高,語言表達(dá)流暢、排版格式規(guī)范、專業(yè)術(shù)語翻譯到位、翻譯的速度非?、后期服務(wù)熱情。我司翻譯了大量的專業(yè)文件,經(jīng)過長久合作,名副其實(shí),值得信賴。”

    北京塞特雷特科技有限公司

  • “針對我們農(nóng)業(yè)科研論文寫作要求,盡量尋找專業(yè)對口的專家為我提供翻譯服務(wù),最后又按照學(xué)術(shù)期刊的要求,提供潤色原稿和相關(guān)的證明文件。非常感謝世聯(lián)翻譯公司!”

    中國農(nóng)科院

  • “世聯(lián)的客服經(jīng)理態(tài)度熱情親切,對我們提出的要求都落實(shí)到位,回答我們的問題也非常有耐心。譯員十分專業(yè),工作盡職盡責(zé),獲得與其共事的公司總部同事們的一致高度認(rèn)可。”

    格萊姆公司

  • “我公司與馬來西亞政府有相關(guān)業(yè)務(wù)往來,急需翻譯項(xiàng)目報備材料。在經(jīng)過對各個翻譯公司的服務(wù)水平和質(zhì)量的權(quán)衡下,我們選擇了世聯(lián)翻譯公司。翻譯很成功,公司領(lǐng)導(dǎo)非常滿意!

    北京韜盛科技發(fā)展有限公司

  • “客服經(jīng)理能一貫熱情負(fù)責(zé)的完成每一次翻譯工作的組織及溝通。為客戶與譯員之間搭起順暢的溝通橋梁。能協(xié)助我方建立專業(yè)詞庫,并向譯員準(zhǔn)確傳達(dá)落實(shí),準(zhǔn)確及高效的完成統(tǒng)一風(fēng)格。”

    HEURTEY PETROCHEM法國赫銻石化

  • “貴公司與我社對翻譯項(xiàng)目進(jìn)行了幾次詳細(xì)的會談,期間公司負(fù)責(zé)人和廖小姐還親自來我社拜訪,對待工作熱情,專業(yè)度高,我們雙方達(dá)成了很好的共識。對貴公司的服務(wù)給予好評!”

    東華大學(xué)出版社

  • “非常感謝世聯(lián)翻譯!我們對此次緬甸語訪談翻譯項(xiàng)目非常滿意,世聯(lián)在充分了解我司項(xiàng)目的翻譯意圖情況下,即高效又保質(zhì)地完成了譯文。”

    上海奧美廣告有限公司

  • “在合作過程中,世聯(lián)翻譯保質(zhì)、保量、及時的完成我們交給的翻譯工作?蛻艚(jīng)理工作積極,服務(wù)熱情、周到,能全面的了解客戶的需求,在此表示特別的感謝!

    北京中唐電工程咨詢有限公司

  • “我們通過圖書翻譯項(xiàng)目與你們相識乃至建立友誼,你們報價合理、服務(wù)細(xì)致、翻譯質(zhì)量可靠。請允許我們借此機(jī)會向你們表示衷心的感謝!”

    山東教育出版社

  • “很滿意世聯(lián)的翻譯質(zhì)量,交稿準(zhǔn)時,中英互譯都比較好,措辭和句式結(jié)構(gòu)都比較地道,譯文忠實(shí)于原文。TNC是一家國際環(huán)保組織,發(fā)給我們美國總部的同事后,他們反應(yīng)也不錯。”

    TNC大自然保護(hù)協(xié)會

  • “原英國首相布萊爾來訪,需要非常專業(yè)的同聲傳譯服務(wù),因是第一次接觸,心中仍有著一定的猶豫,但是貴司專業(yè)的譯員與高水準(zhǔn)的服務(wù),給我們留下了非常深刻的印象。”

    北京師范大學(xué)壹基金公益研究院

  • “在與世聯(lián)翻譯合作期間,世聯(lián)秉承著“上善若水、厚德載物”的文化理念,以上乘的品質(zhì)和質(zhì)量,信守對客戶的承諾,出色地完成了我公司交予的翻譯工作!

    國科創(chuàng)新(北京)信息咨詢中心

  • “由于項(xiàng)目要求時間相當(dāng)緊湊,所以世聯(lián)在保證質(zhì)量的前提下,盡力按照時間完成任務(wù)。使我們在世博會俄羅斯館日活動中準(zhǔn)備充足,并受到一致好評!

    北京華國之窗咨詢有限公司

  • “貴公司針對客戶需要,挑選優(yōu)秀的譯員承接項(xiàng)目,翻譯過程客戶隨時查看中途稿,并且與客戶溝通術(shù)語方面的知識,能夠更準(zhǔn)確的了解到客戶的需求,確保稿件高質(zhì)量!

    日工建機(jī)(北京)國際進(jìn)出口有限公司

15801211926

18017395793
點(diǎn)擊添加微信

無需轉(zhuǎn)接等回電

六安市| 南城县| 大悟县| 长岭县| 海宁市| 桦南县| 乌苏市| 阿鲁科尔沁旗| 庆安县| 广安市| 高台县| 北碚区| 阿拉善右旗| 深水埗区| 铜鼓县| 紫云| 白城市| 婺源县| 德惠市| 江都市| 囊谦县| 太康县| 阜阳市| 广平县| 来宾市| 星座| 色达县| 新巴尔虎左旗| 色达县| 类乌齐县| 普定县| 滨海县| 广州市| 二手房| 奉化市| 循化| 普陀区| 鹿邑县| 湖州市| 芒康县| 凤冈县|