日韩亚洲欧美色图,久久亚洲精精品中文字幕,国产,日韩,欧美综合在线,丰满少妇2中文免费观看,国产精品一区二区20P发布,我强进了老师身体在线观看

手機版
1 2 3 4
首頁 > 新聞中心 > 翻譯公司資訊 >
翻譯公司資訊

世聯(lián)翻譯公司完成工業(yè)制造英文翻譯

發(fā)布時間:2018-09-25 09:10  點擊:

世聯(lián)翻譯公司完成工業(yè)制造英文翻譯

1.                 PROCESS PARAMETERS 

 
 
Plant:                                       One Vertical Pig Iron Ladle Dryer / Preheating Station


 
Ladle Capacity:        4.5 tonnes
                               
 
Ladle Dimensions:          Diameter – 1375mm
                                Height – 1830mm

              Operation:                  Drying
Ambient – 1100oC in 30 hours
                               
Preheating
                                Ambient – 1100oC in 4 hours
                                600oC – 1100oC in 0.5 hours



Proposed Burners:          One Hotwork HV400 High Velocity Gas Burner                                 rated at 586 kW stoichiometric basis
                                              
 
Main Fuel:                                    Natural Gas available at 2 bar at takeover point.
GCV 8760 kcal/Nm3
 
 
Electrical:                               Supply          380V - 3ph - 60Hz, 
Controls      110V - 1ph - 50Hz
(to be confirmed)

 

2.                 SCOPE OF SUPPLY

Supply & Packing of the following:


o   A combustion system based on a single Hotwork HV400 Natural Gas Burner complete with combustion air fan, gas and air control system.
o   Totalising turbine type gas flow meter with pulsed output.
o   Refractory fibre lined heat shield
o   Steel jib arm & central support column with base plate.
o   Supply of a pre-tested temperature control and burner management panel.
o   Electrically actuated screwjack to raise and lower the lid.
 
Design services including:
 
o   Detailed combustion schematic and equipment list
o   General arrangement drawing
o   Floor loadings
o   Control panel layout and wiring diagrams
o   Operating and maintenance manuals on CD ROM in English
 
Supervision of installation and commissioning of the supplied equipment during one visit to your plant.
 
On-site training of personnel during the commissioning phase.

 

3.                 HEAT SHIELD

The cover will be designed to completely cover the specified ladle and will be approximately the same size as the ladle rim in diameter. It will be fabricated in suitably sized mild steel plate and sections, suitably stiffened with radial webs and flanges. 
 
The burner will be mounted on the heat shield in a fabricated metal housing, to fire vertically downwards along the central axis of the ladle.
 
The heat shield will be lined with stack-bonded Non-RCF ceramic fibre blocks retained by stainless steel anchors, suitable for operation up to temperatures of 1100°C. This type of fibre is particularly well suited to this application due to its lightweight construction, thermal performance and reliability.
 
The exhaust gases will escape to atmosphere via an annular gap between the heat shield cover and the vessel rim. It is important to size and maintain this gap correctly as inefficiency can result from incorrect flueing area.

 

4.                 SUPPORT STRUCTURE & MOVEMENT MECHANISM

The ladle heat shield/cover will be suspended from a mild steel jib arm, designed for movement in the vertical plane. The jib arm will be supported from the central support column through bearings and will have the capacity to be manually slewed about the central support column.


The raise and lower function of the heat shield lid will be undertaken by an inverter controlled electrically actuated screw jack. This will enable the heat shield/cover to be raised and lowered by approximately 700mm.
        
The station will be supplied with a drilled floor mounting plate which would allow the unit to be bolted as one complete module to your prepared foundations.
 
We have excluded the supply of the ladle locating base and guides (design included), floor fixing bolts and any civil work.
 
The support frame base and locating guides would accurately locate the ladles under the station which is important for the overall efficiency of the system. 
 
 

5.                 COMBUSTION EQUIPMENT

The system would be designed to comply with European Standard EN746 Industrial Thermoprocessing equipment, Part 2 and will include the following main items:
 
·         A combustion air fan, on the outlet of which will be a three-way air pressure test valve to prove the air pressure switch in the 'no pressure' state, this being required to permit start-up of the system.
 
·         A motorised air control valve with low fire proving differential pressure switch.
 
·         A combustion air orifice plate with purge proving differential pressure switch.
 
·         One Hotwork HV400 High Velocity Ceramic Burner complete with quarl, sight glass and igniter.  Flexible nipples would be provided to offset vibration.
 
·         Burner gas components mounted on the station consisting of an isolation valve, one safety shut-off valve and an air/gas ratio regulator.
 
·         A main gas train consisting of manual isolation valve, filter, gas pressure governor with overpressure protection, pressure switches, main safety shut-off valve and weep/vent solenoids supplied on a support bracket mounted off the system.
 
·         A pilot train comprising gas pressure regulator, two gas safety shut off valves and two gas isolation valves.
 
·         An auxiliary air supply taken from the main combustion air supply to provide cooling air to the flame scanner.
 
·         To allow the station to lift and slew, a 4mtr long gas flexible hose.
 
·         To allow monitoring of energy use on the station, a totalising turbine type gas flow meter with pulsed output to communicate with the plant data logging system.
 
·         Impulse lines from the controlled combustion air supply to the air/gas ratio regulator to ensure correct air/gas ratio throughout the burner range, together with a motorised impulse bleed valve to provide the option of fuel  only control (excess air facility) at lower operating temperatures. 
 
During the drying process in order to control low temperatures and to remove moisture and volatiles from new refractories, the system will operate with full combustion air flow with the thermal rate being varied by increasing or decreasing the flow of gas to the burners.

During preheating the system will fire on ratio with both the air and gas flow varying as required to increase or decrease the thermal output.


 
BURNER SPECIFICATION
 
Description Data
Maximum Thermal Rating (kW) 586
Air Pressure at burner, mb cold at 20 oC 30
Gas Pressure at burner, mb 22
Maximum Turndown Stoichiometric 10 : 1
NB - This information is for guidance only
 
 
 
PROVISIONAL FAN SPECIFICATION 
 
The combustion air fan will have a noise levels of less than 85 dB(A) @ 1m.
Description Volume
m3a/h
Pressure
mb
Temp
oC
Combustion Air Fan 730 70
pressure
20
 
 
 
 
 
Note: Noise levels of fans will be assessed at 1m from the fan(s) if they are free standing or otherwise measured at 1m outside of any acoustic housing installed for the purpose of reducing environmental noise. Combustion generated noise measured as ‘breakout’ noise from poor door seals or uncontrolled furnace openings is excluded.
 

6.                 ELECTRICAL

A control system will be provided for the purpose of initiating and monitoring the safe start-up and operation of the ladle station and secondly to control the operating parameters to ensure optimum performance.
 
To achieve this, we propose a single control panel for the system which would be mounted adjacent to the station and would house the necessary equipment for system light up, operation and shutdown. This equipment will generally comprise:


·         Enclosure
·         Door interlocked 3 phase mains isolator
·         Combustion air starter and motor protection unit
·         Screwjack inverter
·         Step down control transformer
·         Eurotherm Temperature programmer - 10 programmes each with 16 segments.
·         Eurotherm Over temperature policeman
·         Alarm sirens, and beacons
·         Interface and control relays
·         Emergency stop relay, indicator lamps and buttons
·         Honeywell flame programmer and UV scanners
The panel would be designed, built and functionally tested in our works prior to despatch.
 
       Functional Description
 
The system temperature control will be undertaken by the temperature programmer running a temperature program profile to cover the process temperature ramps and holds. It would sense the vessel atmosphere and generate the appropriate signals to be sent to the control valves.
 
The system will be designed to provide the following functions.
 
§    System Start-Up
·     Air fan running
·     System air pressure healthy
·     System gas pressure healthy
·     purge completed
·     pipework (flexible) proving healthy
      
 
The Kromschroder burner safe start system will:
 
§    Drive the combustion air control valve to the purge position and purge the ladle with an air flow for five continuous volumes ensuring that there are no combustible gases present on light-up.
 
§    Drive the combustion air control valve to low fire and prove this condition prior to energising the pilot safety shut off valves and igniting the pilot flame.
§    Light the burner main flame and establish automatic temperature control.
 
§    Control the flow of air and gas in response to demands from the temperature in the ladle.
 
§    To ensure that on failure of the prescribed start permissives, the control system would go to lockout. An audible alarm would sound and a flashing beacon would light to draw attention to the fault.
 
§    Cause the automatic controlled shutdown of the system in the event of excessive fluctuations in gas or air pressures, excessive temperatures or loss of flame.
 
To protect the ladle refractories, lid and combustion system from excessive heat, an over temperature controller is included to shut the system down if a predetermined temperature setpoint is exceeded.
 
A gas safety system will be provided which will ensure that gas is only allowed to the burner after the ladle has been purged and the flexible have been checked for leakage. This is achieved by a series of bypasses and vents, which allow the system to be pressurised and checked for leaks. 
 
 

7.                 PREFABRICATION

In order to optimise the site installation time, the following would be pre-assembled to our detailed design at our Dewsbury workshops before being part dismantled into suitable sub-assemblies prior to their packing ready for collection:


·         main gas control train mounted on a support frame
·         air control train
·         heat shield
·         burner
·         jib arm
·         central support column
·         electrical control panel

 

8.                 SUPERVISION OF INSTALLATION & COMMISSIONING

The equipment in the scope of the supply will be installed by local labour who will assemble the station on prepared foundations under the supervision of an HCT engineer.


On completion of the installation phase, we will commission the combustion and control systems to the point of heating ladles. During this period, we will instruct your operators/maintenance personnel in the correct operation and maintenance procedures.
 
The installation and commissioning phase is scheduled to take 5 consecutive days to complete based on 10 hour shifts. Any additional time that may be required for reasons beyond HCT’s control would be charged extra.
 
Our price at this stage excludes travel time, travel costs, hotel and subsistence expenses.
 
 

9.                 DESIGN

An engineering package will be provided for the design of the station and will include the following drawings:


·         Detailed combustion schematic
·         Detailed bill of materials
·         General arrangement drawing
·         Floor loadings
·         Ladle base and locating guides
·         Control panel layout and wiring diagrams
·         Operating and Maintenance Manuals on CD ROM in English
 
HCT currently operates Auto-Cad Release 2011 on which the necessary drawings will be produced.  Drawings can also be converted to IGES or DXF format for translation to other CAD systems. 
 
The drawings and manuals would be provided in the English language and would be supplied in duplicate on CD ROM.

 

10.            HOTWORK DRYING AND PRE-HEATING SYSTEMS

The Hotwork CT Vessel Drying and Preheating System is now used in over two hundred separate installations at major steelmaking and aluminium plants throughout the world. The process offers significant benefits in terms of combustion efficiency, temperature uniformity and control of temperature.
 
The most efficient transfer of heat to the vessel lining is achieved during drying and preheating by utilising the products of combustion at high velocity and under pressure. Consequently, our proposal incorporates a high velocity burner firing into the vessel enclosure. The use of forced convection maximises heat transfer by breaking down the boundary layer of still air adjacent to the surface to be heated.
               
In drying applications, moisture and volatiles are rapidly removed from the refractory lining. The system will be designed to use high levels of excess air during the drying process, to ensure the efficient removal of water vapour and volatiles from the refractories and also to enable better control of temperature, particularly early in the process at low temperature.
 
Temperature uniformity over the complete lining surface is also improved, reducing hot spots and so virtually eliminating cracking or spalling of the linings, resulting in increased refractory life.
 

11.            EXCLUSIONS

· Any civil works including supply of ladle guides/locating base/mounting bolts
· Any spares
· Any engineering site visits
· Dual fuel operation
· Any venting of valves to atmosphere
· Any site installation labour and materials except for supervision
· Travel time, travel costs and local expenses
· Refractory dryout and heating/performance trials
· Delivery
· Taxes or duties
· Bank holiday or shift working
· Process thermocouples
· Any third party certification
· Any equipment or services not mentioned above


 

12.            SERVICES BY THE CLIENT

· Main incoming supply to the panel
· Fuel for commissioning and testing
· Site installation of equipment (material and labour)
· Scaffolding/Craneage
· Electrical power
· Staff for commissioning assistance
· Use of telephone and fax/email facilities
· Use of site cabin and mess facilities
· Secure storage area


13.            WARRANTIES

The equipment would be warranted for operation for 12 months from Acceptance or 18 months from Delivery, whichever is the earlier, with the exception of the following items which are considered as consumable and therefore are not eligible for warranty:
 
o   Flame detectors
o   Thermocouples
o   Filters
o   Fuses, lamps and pushbuttons  
o   Solenoids, regulator springs and diaphragms

 
COMMERCIAL
 

1.    BUDGET PRICE

For the design, supply packed Ex Works, supervision of installation and commissioning of a HV400 pig iron drying and preheating system, generally as described herein, our budget price is:
 
Site Rates:
·           Supervision & Commissioning: €850.00 per 10 hour man day or part thereof.
 

2.    DELIVERY

We would expect the equipment to be ready for delivered Ex Works in 14-16 weeks from receipt of down payment.   
 

3.    VALIDITY

  This is a budget proposal and as such is not open for acceptance.
 

4.    TAXES AND DUTIES

       To be charged extra as appropriate.
 

5.    TERMS OF PAYMENT

To be agreed but we propose the following:
 
·         50% of the contract price to be invoiced with acknowledgement of order, to be settled immediately on receipt of invoice.
·         45% of the contract price to be invoiced on readiness to deliver, to be settled immediately on receipt of invoice.
·         5% of the contract price to be invoiced on completion of commissioning, 30 days.
             

6.    TERMS AND CONDITIONS OF SALE

       HCT terms and conditions of business apply, a copy available on request.
 

7.    CONFIDENTIALITY

Any information, know-how or date contained in this specification is strictly confidential and is not to be divulged to a third party.
 

 

8.    CUSTOMER CARE

In order to improve continuously the service that we offer our customers, HCT operate a customer care policy.  Through a centralised point within the company, your concerns and queries regarding the service you receive will be dealt with objectively and independently.  Please contact the office of David Robinson, Managing Director if a situation arises that you feel requires this sort of attention.
 
 

9.    ACCEPTANCE

On turnkey multi-disciplined projects, we recognise the need for a defined end point to contract.  With this in mind, HCT operate an Acceptance process where measurable parameters are set out, by mutual agreement, to be confirmed during the closing stages of the project.
 
Typical examples of these parameters are fuel usage, production levels and delivery programme benchmarks.  The Acceptance/Hand-over procedure will benefit HCT and it’s customers in the elimination of 'grey areas' and uncertainty.  This will usually take the form of nominated representatives from both parties "signing off" completed work and agreeing any changes or modifications to the original scope.
 
The specific detail of the Acceptance criteria would be covered during the quotation or post order discussion stages.

Unitrans世聯(lián)翻譯公司在您身邊,離您近的翻譯公司,心貼心的專業(yè)服務(wù),專業(yè)的全球語言翻譯與信息解決方案供應(yīng)商,專業(yè)翻譯機構(gòu)品牌。無論在本地,國內(nèi)還是海外,我們的專業(yè)、星級體貼服務(wù),為您的事業(yè)加速!世聯(lián)翻譯公司在北京、上海、深圳等國際交往城市設(shè)有翻譯基地,業(yè)務(wù)覆蓋全國城市。每天有近百萬字節(jié)的信息和貿(mào)易通過世聯(lián)走向全球!積累了大量政商用戶數(shù)據(jù),翻譯人才庫數(shù)據(jù),多語種語料庫大數(shù)據(jù)。世聯(lián)品牌和服務(wù)品質(zhì)已得到政務(wù)防務(wù)和國際組織、跨國公司和大中型企業(yè)等近萬用戶的認(rèn)可。 專業(yè)翻譯公司,北京翻譯公司,上海翻譯公司,英文翻譯,日文翻譯,韓語翻譯,翻譯公司排行榜,翻譯公司收費價格表,翻譯公司收費標(biāo)準(zhǔn),翻譯公司北京,翻譯公司上海。
  • “貴司提交的稿件專業(yè)詞匯用詞準(zhǔn)確,語言表達流暢,排版規(guī)范, 且服務(wù)態(tài)度好。在貴司的幫助下,我司的編制周期得以縮短,稿件語言的表達質(zhì)量得到很大提升”

    華東建筑設(shè)計研究總院

  • “我單位是一家總部位于丹麥的高科技企業(yè),和世聯(lián)翻譯第一次接觸,心中仍有著一定的猶豫,貴司專業(yè)的譯員與高水準(zhǔn)的服務(wù),得到了國外合作伙伴的認(rèn)可!”

    世萬保制動器(上海)有限公司

  • “我公司是一家荷蘭駐華分公司,主要致力于行為學(xué)研究軟件、儀器和集成系統(tǒng)的開發(fā)和銷售工作,所需翻譯的英文說明書專業(yè)性強,翻譯難度較大,貴司總能提供優(yōu)質(zhì)的服務(wù)!

    諾達思(北京)信息技術(shù)有限責(zé)任公司

  • “為我司在東南亞地區(qū)的業(yè)務(wù)開拓提供小語種翻譯服務(wù)中,翻譯稿件格式美觀整潔,能最大程度的還原原文的樣式,同時翻譯質(zhì)量和速度也得到我司的肯定和好評!”

    上海大眾

  • “在此之前,我們公司和其他翻譯公司有過合作,但是翻譯質(zhì)量實在不敢恭維,所以當(dāng)我認(rèn)識劉穎潔以后,對她的專業(yè)性和貴公司翻譯的質(zhì)量非常滿意,隨即簽署了長期合作合同!

    銀泰資源股份有限公司

  • “我行自2017年與世聯(lián)翻譯合作,合作過程中十分愉快。特別感謝Jasmine Liu, 態(tài)度熱情親切,有耐心,對我行提出的要求落實到位,體現(xiàn)了非常高的專業(yè)性!

    南洋商業(yè)銀行

  • “與我公司對接的世聯(lián)翻譯客服經(jīng)理,可以及時對我們的要求進行反饋,也會盡量滿足我們臨時緊急的文件翻譯要求。熱情周到的服務(wù)給我們留下深刻印象!”

    黑龍江飛鶴乳業(yè)有限公司

  • “翻譯金融行業(yè)文件各式各樣版式復(fù)雜,試譯多家翻譯公司,后經(jīng)過比價、比服務(wù)、比質(zhì)量等流程下來,最終敲定了世聯(lián)翻譯。非常感謝你們提供的優(yōu)質(zhì)服務(wù)。”

    國金證券股份有限公司

  • “我司所需翻譯的資料專業(yè)性強,涉及面廣,翻譯難度大,貴司總能提供優(yōu)質(zhì)的服務(wù)。在一次業(yè)主單位對完工資料質(zhì)量的抽查中,我司因為俄文翻譯質(zhì)量過關(guān)而受到了好評!

    中辰匯通科技有限責(zé)任公司

  • “我司在2014年與貴公司建立合作關(guān)系,貴公司的翻譯服務(wù)質(zhì)量高、速度快、態(tài)度好,贏得了我司各部門的一致好評。貴司經(jīng)理工作認(rèn)真踏實,特此致以誠摯的感謝!”

    新華聯(lián)國際置地(馬來西亞)有限公司

  • “我們需要的翻譯人員,不論是筆譯還是口譯,都需要具有很強的專業(yè)性,貴公司的德文翻譯稿件和現(xiàn)場的同聲傳譯都得到了我公司和合作伙伴的充分肯定。”

    西馬遠東醫(yī)療投資管理有限公司

  • “在這5年中,世聯(lián)翻譯公司人員對工作的認(rèn)真、負(fù)責(zé)、熱情、周到深深的打動了我。不僅譯件質(zhì)量好,交稿時間及時,還能在我司資金周轉(zhuǎn)緊張時給予體諒!

    華潤萬東醫(yī)療裝備股份有限公司

  • “我公司與世聯(lián)翻譯一直保持著長期合作關(guān)系,這家公司報價合理,質(zhì)量可靠,效率又高。他們翻譯的譯文發(fā)到國外公司,對方也很認(rèn)可!

    北京世博達科技發(fā)展有限公司

  • “貴公司翻譯的譯文質(zhì)量很高,語言表達流暢、排版格式規(guī)范、專業(yè)術(shù)語翻譯到位、翻譯的速度非?、后期服務(wù)熱情。我司翻譯了大量的專業(yè)文件,經(jīng)過長久合作,名副其實,值得信賴!

    北京塞特雷特科技有限公司

  • “針對我們農(nóng)業(yè)科研論文寫作要求,盡量尋找專業(yè)對口的專家為我提供翻譯服務(wù),最后又按照學(xué)術(shù)期刊的要求,提供潤色原稿和相關(guān)的證明文件。非常感謝世聯(lián)翻譯公司!”

    中國農(nóng)科院

  • “世聯(lián)的客服經(jīng)理態(tài)度熱情親切,對我們提出的要求都落實到位,回答我們的問題也非常有耐心。譯員十分專業(yè),工作盡職盡責(zé),獲得與其共事的公司總部同事們的一致高度認(rèn)可。”

    格萊姆公司

  • “我公司與馬來西亞政府有相關(guān)業(yè)務(wù)往來,急需翻譯項目報備材料。在經(jīng)過對各個翻譯公司的服務(wù)水平和質(zhì)量的權(quán)衡下,我們選擇了世聯(lián)翻譯公司。翻譯很成功,公司領(lǐng)導(dǎo)非常滿意!

    北京韜盛科技發(fā)展有限公司

  • “客服經(jīng)理能一貫熱情負(fù)責(zé)的完成每一次翻譯工作的組織及溝通。為客戶與譯員之間搭起順暢的溝通橋梁。能協(xié)助我方建立專業(yè)詞庫,并向譯員準(zhǔn)確傳達落實,準(zhǔn)確及高效的完成統(tǒng)一風(fēng)格。”

    HEURTEY PETROCHEM法國赫銻石化

  • “貴公司與我社對翻譯項目進行了幾次詳細(xì)的會談,期間公司負(fù)責(zé)人和廖小姐還親自來我社拜訪,對待工作熱情,專業(yè)度高,我們雙方達成了很好的共識。對貴公司的服務(wù)給予好評!”

    東華大學(xué)出版社

  • “非常感謝世聯(lián)翻譯!我們對此次緬甸語訪談翻譯項目非常滿意,世聯(lián)在充分了解我司項目的翻譯意圖情況下,即高效又保質(zhì)地完成了譯文!

    上海奧美廣告有限公司

  • “在合作過程中,世聯(lián)翻譯保質(zhì)、保量、及時的完成我們交給的翻譯工作?蛻艚(jīng)理工作積極,服務(wù)熱情、周到,能全面的了解客戶的需求,在此表示特別的感謝!

    北京中唐電工程咨詢有限公司

  • “我們通過圖書翻譯項目與你們相識乃至建立友誼,你們報價合理、服務(wù)細(xì)致、翻譯質(zhì)量可靠。請允許我們借此機會向你們表示衷心的感謝!”

    山東教育出版社

  • “很滿意世聯(lián)的翻譯質(zhì)量,交稿準(zhǔn)時,中英互譯都比較好,措辭和句式結(jié)構(gòu)都比較地道,譯文忠實于原文。TNC是一家國際環(huán)保組織,發(fā)給我們美國總部的同事后,他們反應(yīng)也不錯!

    TNC大自然保護協(xié)會

  • “原英國首相布萊爾來訪,需要非常專業(yè)的同聲傳譯服務(wù),因是第一次接觸,心中仍有著一定的猶豫,但是貴司專業(yè)的譯員與高水準(zhǔn)的服務(wù),給我們留下了非常深刻的印象!

    北京師范大學(xué)壹基金公益研究院

  • “在與世聯(lián)翻譯合作期間,世聯(lián)秉承著“上善若水、厚德載物”的文化理念,以上乘的品質(zhì)和質(zhì)量,信守對客戶的承諾,出色地完成了我公司交予的翻譯工作!

    國科創(chuàng)新(北京)信息咨詢中心

  • “由于項目要求時間相當(dāng)緊湊,所以世聯(lián)在保證質(zhì)量的前提下,盡力按照時間完成任務(wù)。使我們在世博會俄羅斯館日活動中準(zhǔn)備充足,并受到一致好評!

    北京華國之窗咨詢有限公司

  • “貴公司針對客戶需要,挑選優(yōu)秀的譯員承接項目,翻譯過程客戶隨時查看中途稿,并且與客戶溝通術(shù)語方面的知識,能夠更準(zhǔn)確的了解到客戶的需求,確保稿件高質(zhì)量!

    日工建機(北京)國際進出口有限公司

15801211926

18017395793
點擊添加微信

無需轉(zhuǎn)接等回電

宁晋县| 卢湾区| 大连市| 贺兰县| 德清县| 惠安县| 杨浦区| 张掖市| 榆树市| 巫山县| 思茅市| 周至县| 大石桥市| 揭西县| 游戏| 革吉县| 上蔡县| 甘南县| 洪雅县| 邓州市| 开封市| 丹凤县| 淮安市| 游戏| 阜康市| 乡宁县| 宽甸| 济源市| 泾阳县| 龙陵县| 资中县| 孝义市| 栾城县| 沧源| 新民市| 三门县| 新余市| 高邑县| 鄂托克前旗| 阆中市| 普兰县|